Documentation and process for QA & R&D.
Documents, samples and checkpoints required before packaging approval.
§01 · Technical review
Product application data
Our technical team reviews the packaging application before confirming material, size and available documents for the item.
- Product contents
- Food or beverage type, filling temperature and storage conditions
- Use case
- Direct contact, takeaway, delivery, chilled, frozen or shelf display
- Components
- Cup, lid, lidding, sleeve or other matching components
- Reference specification
- Drawing, existing sample, internal standard or testing target
§02 · Quality control
Process checkpoints
Inspection scope is adjusted to the packaging type. Available results and documents are confirmed during review.
- Incoming material
- Material inspection and supplier supporting documents
- In production
- Print registration, colour, forming and structural integrity
- Testing
- Leak, lid-fit, compression and other relevant testing
- Batch release
- QC results recorded against the relevant production batch
§03 · Documents & approval
Files available for QA review
Company certificates do not automatically cover every product and application combination. Document scope is confirmed against the item under review.
- Certificates
- FSSC 22000, ISO 9001, ISO 14001, ISO 45001 and Halal
- Material
- Technical specifications, MSDS and available food-contact documents
- Approval sample
- Samples are prepared after technical specification agreement
- Batch
- Traceability report for the relevant production run
The SEAL rPET programme
rPET with a dedicated line, own molds and group laboratory support.
For coffee chains, QSR and food brands bringing recycled PET into their packaging programmes. SEAL connects cup and bowl requirements with technical evaluation and supply planning.
§04 · Request review
Send your project brief
We will review specifications, volume per SKU, schedule and required documents before proposing the next step.