PT. SEAL Packaging Indonesia · Coffee chains
Packaging programmes for national coffee chains.
Paper cups, cold cups, sleeves and supporting packaging planned as one portfolio of sizes and designs.
§01 · Programme scope
Coffee chains requirements we handle
- 01 Hot and cold cup standardisation across outlets
- 02 New size or menu launch
- 03 Seasonal programme with separate artwork
- 04 Second source for continuity of core categories
§02 · Initial inputs
Information for specification review
Our team uses these inputs to assess material, MOQ, sample schedule, production and required documents.
- Size portfolio
- Cup sizes, lid type, sleeves and matching components
- Forecast
- Monthly requirement per size and seasonal variation
- Artwork
- Regular and seasonal designs plus brand-colour requirements
- Operating footprint
- Outlets, warehouses, DCs or distribution partners involved
§03 · Procurement parameters
Capacity, MOQ and schedule
- Recorded capacity
- 5 million units per month
- MOQ
- 10,000-50,000 units per design; selected items 20,000-50,000
- Samples
- 7-14 working days after specification agreement
- Production
- Typically 14-21 working days after artwork approval
- Quotation
- Prepared per project after specification review
§04 · Scope of service
Requirements outside our scope
-
Retail, single-unit or per-piece purchases
Every design needs its own printing plate and forming setup, so MOQ is counted per artwork design.
-
Creating or preparing artwork
Artwork is prepared and supplied by the brand owner, print-ready. We apply Pantone colour matching to that file.
-
Alcoholic-beverage packaging
Outside SEAL’s scope of service.
-
Cup sealers and other packaging machinery
Outside SEAL’s supply scope. What we supply is the cup and the sealing film.
-
Non-F&B packaging — cosmetics, pharma, supplements, chemicals, household
Our scope is food and beverage only.
§05 · Frequently asked questions
What is the MOQ for custom paper cups?
+
MOQ ranges from 10,000-50,000 units per design, depending on size and print process.
Can several sizes be combined?
+
A programme may include several sizes, but MOQ and setup are still calculated per design or artwork.
What is the production lead time?
+
Typically 14-21 working days after artwork approval. The final schedule follows specification and production loading.
The SEAL rPET programme
rPET with a dedicated line, own molds and group laboratory support.
For coffee chains, QSR and food brands bringing recycled PET into their packaging programmes. SEAL connects cup and bowl requirements with technical evaluation and supply planning.
- Dedicated line
- Our rPET programme runs through joint operation with a dedicated line. Discuss production allocation against your SKUs, forecast and required schedule.
- SEAL-owned molds
- Start with the format, dimensions and matching lid. Mold review and samples form part of specification approval.
- Group laboratory
- Supported by Dermapack QC capabilities within our group: dimensional measurement, colour evaluation and performance testing suited to the packaging construction.
- Ready for procurement review
- Compare samples, specifications, material documents and a drawdown plan before appointing a second source or transitioning supply.